GEFrame7FATemp-Prodcuts-Banner1
Equipment Finder
Use the following quick
search to view the services
we provide on your product.
Equipment Type
Manufacturer
Model

 

 GE 7FA Gas Turbines

GE 7FA Gas Turbines

GE Frame 7FA owners have a choice when it comes to the health and performance of their equipment. Wood Group GTS provides independent and tailored solutions for 7FA equipped facilities. Our comprehensive suite of products and services are designed to deliver value that fits your individual need.

Wood Group GTS has you covered for:
  • Lower life cycle costs
  • Increasing plant efficiency
  • Enhanced engine performance
“We have a track record of service innovation and lowering the cost of ownership for industrial gas turbine operators.”
Mark Papworth
CEO
Wood Group GTS

Our 7FA solutions address the three major elements that every 7FA owner manages, measures and looks to improve upon:

  • Major Maintenance
  • Operations and Maintenance
  • Modifications and upgrades

7FA Major Maintenance

We aim to deliver lower life cycle costs to owners and operators of 7FA gas turbines. For over 25 years, we have delivered independent major maintenance services for GE gas turbines and have built an impressive portfolio of clients from around the world. Our unique approach to risk management and contracting flexibility provides choice, enabling operators to select a maintenance solution that offers the best value for their business. Transparency of process and alignment of goals around what’s important to customers makes us different.

7FA Operations and Maintenance

We bring to bear the experience of operating more than 50 facilities, totalling over 12,000 MWs, with the goal of driving increased efficiency in plant and personnel performance. Our proven programs, practices and procedures have been honed from a solid foundation of operating experience, delivering improved plant profitability.

More information on our gas turbine operations and maintenance service

7FA Modification and Upgrades

Our GE Frame 7FA Modification and Upgrade program delivers increased plant efficiency and flexibility, while providing return on investment and fast payback periods. We offer a comprehensive portfolio of solutions and can help you formulate an upgrade plan based on your individual goals. From fuel and combustion conversions, automated combustion tuning and power augmentation, through to control system and component upgrades, Wood Group GTS can improve your operations and bottom line performance.

More information on our gas turbine modifications and upgrades service

Have an enquiry on our GE 7FA Solutions?
Contact us 7FA Solutions

More information

 Parts Solutions

 Parts Solutions

We offer an extensive GE Frame 7FA parts solution and service for the industrial gas turbine aftermarket through our strategic alliance with Pratt & Whitney Power Systems (PWPS).  Wood Group GTS has an exclusive license for sale and distribution of PWPS manufactured combustion hardware, hot gas path components and high technology repair services which support power plant owners and operators with long-term maintenance agreements.

Comprehensive parts service for your GE 7FA gas turbine

With a commitment to delivering quality parts that ensure the performance of your equipment, we provide wide range of spare parts certified to industry standards on time and on budget.

“The combination of PWPS' engineering, new part manufacturing and repair technology and GTS’ service experience and risk management strategies is a compelling proposition.”
Peter Christman
President
Pratt & Whitney Power Systems

  • New capital 7FA parts: In house engineered and manufactured parts that incorporate improvements in both design and price.
  • Reconditioned Serviceable 7FA capital parts: Offering a wide choice of components, we deliver fast and cost effective solutions with a full Wood Group GTS warranty.
  • 7FA Parts repair: With our latest technology in inspection and refurbishment services, restore your parts to zero hour condition.

GE 7FA Parts Supply

PWPS has designed the rotating components for the hot gas path of the Frame 7FA gas turbine. The designs incorporate their extensive high-temperature experience to provide improved total life-cycle costs. Compared to the OEM the design of parts has been improved upon to minimize oxidation, creep and metal temperature which ultimately extends part life and reduces operating costs.

For more information on our 7FA parts supply

Have an enquiry on our GE 7FA Part Solution?
Contact us 7FA Part Solution query

More information

 Automated Tuning

 Automated Tuning

A 7FA gas turbine power plant operator must contend with various conditions to achieve plant reliability, efficiency, and profitability. Operational flexibility is critical to maximising output and minimising environmental effects.

Our gas turbine optimisation product ECOMAX™ provides a power plant operator with a turn-key system that offers the following:
  • Customised operational goals
  • Emissions management/compliance
  • Combustion dynamics control/mitigation
  • Increased fuel flexibility
  • Improved allowable load operating range
  • Continual optimisation
  • Increased power potential
A DLN Automated Solution for GE Frame 7FA

Plant operation for a 7FA gas turbine can be adjusted to meet the following objectives:

  • Combustion dynamics mitigation
  • Exhaust emissions compliance
  • Optimise station power and efficiency
  • Maximise station availability and reliability

Have an enquiry on our GE 7FA automated tuning?
Contact us 7FA automated tuning query

More information

 Compressor Cleaning

 Compressor Cleaning

We have redefined 7FA gas turbine cleaning technology through our Water Wash Cleaning System which uses new methods. The development of our highly atomised direct injection system has allowed engine cleaning to achieve a giant step forward in providing a cost-effective and environmentally-adapted method that gives substantially improved results.

Wood Group GTS’ patented highly atomised online/offline wash is individually developed for each type of turbine following a design procedure that is well established and proven.

Benefits

  • Over 800 units with 20 million operating hours of demonstrated recovery and erosion robustness
  • Return on investment in less than 3 months
  • Reduce water consumption by up to 65%
Compressor Water Wash Cleaning System for Gas Turbine Services

Have an enquiry on our GE 7FA compressor cleaning?
Contact us 7FA compressor cleaning query

More information

 Rotor Services

Rotor Services

Wood Group GTS provides a comprehensive overhaul service for heavy duty gas turbines including the compressor rotor and turbine section. Both in the field and from within our dedicated workshops we offer skilled and experienced staff to provide technical support and perform the complex operations needed to restore your rotor back to serviceable condition as quickly as possible.

Our global support network and strategically located facilities means that you are never far from our support service. Wood Group GTS’ depth of technical expertise and the knowledge we have gained from operations and maintenance of over 10GW of power generation, makes us an ideal maintenance partner for your business. Carrying a stock of new capital parts and serviceable exchange equipment will ensure we’re able to meet your demanding maintenance schedule. Our range of services include:

  • Pre–stripdown balance and inspection
  • Rotor disassembly
  • NDT facilities
  • Individual blade and wheel coating
  • Latest coating technologies
  • Individual wheel balancing
  • Rotor re-blade
  • Rotor reassembly
  • Rotor balance and run-outs
  • Rotor storage containers
  • Comprehensive customer reports

Wood Group GTS offer exchange programme enabling customers to benefit from the availability of serviceable sub-assemblies and kits, including a complete serviceable rotor. To minimise maintenance downtime units can be pre-delivered to site in advance of the next planned maintenance outage

Have an enquiry on our GE 7FA Rotor Services?
Contact us 7FA Rotor Services query

More information

 Power Augmentation

 Power Augmentation

Wood Group GTS’ power augmentation system is based on fogging nozzles and high pressure water technology, which is also used for our compressor wash systems. The power augmentation system is designed to local conditions, optimising the augmentation to the weather conditions momentarily

7FA Gas Turbine Power Augmentation Benefits
  • Low investment costs
  • Increased output
  • Optimised performance
  • Simple operation
  • Less maintenance items
Gas Turbine Power Augmentation

Have an enquiry on our GE 7FA Power Augmentation?
Contact us 7FA Power Augmentation query

More information

 ‭(Hidden)‬ Content Editor Web Part ‭[1]‬

Contact Us
Email us
gts@woodgroup.com
Send an enquiry form
Compressor water wash system on 2 x GE Frame 6B Gas Turbines
A combined cycle plant located in Thailand and positioned near sea level in a high humidity and a pollution laden environment had been practicing conventional low pressure offline wash cycles. Overall performance monitoring illustrated continued rapid gas turbine output degradation, forcing an offline wash frequency of approximately every 1000 hours.
1 of 4
Compressor water wash system on 2 x GE Frame 7EA Gas Turbines
With ever increasing requirements to operate and maintain existing gas turbine assets at their highest efficiencies, the staff of Direct Energy’s Paris, Texas Generating Facility began identifying options to improve overall plant efficiencies
2 of 4
Multi stage compressor cleaning system on 2 x GE Frame 6B
TNB Sultan Ismail Power Station (PAKA) operates four simple cycle GE Frame 9E units. These units were cleaned twice a year at overhauls with abrasive materials. The ever increasing requirements to operate and maintain existing gas turbine assets at their highest efficiencies, instigated the staff of PAKA to begin identifying options to improve overall plant efficiencies.
3 of 4
Multi-stage compressor cleaning system on SW501F
Cleco Evangeline, an intermediate load following power plant, is located in rural, central Louisiana and is the Siemens LTP SGT6- 5000F (SW501F) class engine operational hour’s fleet leader. The engines experience compressor fouling from seasonal, environmental and agricultural conditions, such as pollen and prescribed burning of local sugarcane and cotton fields, resulting in loss performance.
4 of 4
Group awarded GE Frame 7FA operations and maintenance
Wood Group awarded GE Frame 7FA operations and maintenance contract by Associated Electric Cooperative.
Wood Group GTS forms strategic alliance with Pratt & Whitney Power Systems for ‘F’ technology services
Wood Group GTS has entered into a strategic alliance with Pratt & Whitney Power Systems (PWPS) to jointly service the GE Frame 7FA industrial gas turbine aftermarket...
Automated Tuning GE Frame 7FA ECOMAX™ - A DLN Automated Solution for GE Frame 7FA
A combined cycle facility located in the arid desert region of the southwest United States experiences significant changes in the daily ambient temperature.


© 2002-2011 John Wood Group PLC